What is the minimum curing time for cement concrete?
Curing is the process in which the concrete is protected from loss of moisture and kept within a , Compressive strength reduces to 50%, If it would be in air without curingFrom the above figure, , The period could be reduced to 3 days if high early strength concrete is used and the temperature is above 10º C As the early....


